George A. Escano, Project Control Scheduler Mountain House, CA 951-334-2473 TWIC Card Available & RSO 951-334-2473 GESCN@AOL.com Prepares
Project's Baseline Program Schedules (FEED to Project Closeout), Cost &
resource loading schedules analysis, Schedule updating and re-sequencing of
work activities, Conceptual schedules and developing detailed work breakdown
structure (WBS) in Primavera / MS Project. Other objective includes claim
preparation and time impact analysis that provides equitable time & cost
entitlement to the overall project (Delay Analysis for Windows - DAW). Prepares
estimated quantity reporting system using, Earned Value Methodology (EVM) and
CPM total float methodology. Analyzes RFP in providing project's scope and
graphically shows major requirements before pre-bid conference to its actual
bid submittal to Owner --Conceptual schedules and man hour estimating are
submitted with bids (Linear schedules). Cost and scheduling integration using
P6 via SAP. Provide critical path evaluation & risk analysis to program
management. Prepares & develops Time Impact Analysis/ Delay Notification
Report (DN) for approval by Program Managers to the U.S. Navy. Work Experience Jacobs Engineering, May 2015 -
Present, (Peak Technical) – Sr. Scheduler: Planning& Scheduling support to major work modernization within
refineries at Richmond (Chevron) & Carson (Tesoro) California. My
responsibility are as follows: · Engineering
& construction scheduling, coordination of work process with the Project
Manager & Engineers · Resource
loading of estimated hours of the project. Input to P6 as required. Monthly
reports. · Monitoring
& updating daily work progress via P6 & report progress to management San Francisco Bay Area (Natural Gas
Midstream Pipeline jobs) - February 2015 to April 2015 – Planner Scheduler
(Contractors) - Responsible
in developing project schedules of capital jobs within the refinery as an
independent contractor as follows; · Providing
Primavera scheduling task gathering progress quantities installed. · MS Project
scheduling tool has been used on a daily basis. I am also providing scheduling
services day-to-day reports regarding deviation from its original baseline
schedule. · Monthly
invoices review for payment application (schedule of values). · Scheduling
reviews of critical path that impacts completion of the project milestones. · It includes
actual installed quantity updates in primavera data base via survey plot
through GPS survey (PSSI). Saulsbury Industries, August 2011 to
December 2014 - Senior Scheduler: Saulsbury
Industry is a Design-Build firm inclusive of developing project schedules
such as projects located at Wheeler, Texas. I was assigned to a natural gas
refining plant with refrigeration & compressor units for Cryo plant that
produces refined natural gas in Texas. My responsibilities are as follows: · Schedule
development and tracking progress using primavera systems while in Design
Build stages. The schedule includes PSSR in the final stages of commissioning
& startup · Monitors
Material Deliveries on site via P6 (MPR) includes prefabrication of pipe
system (spool assemblies) · Monitoring
progress via EVM & total float report to the managers of projects/owner · Check
field progress Tessenderlo-Kerly, June 2011 to August
2011 (Contractor)- Senior Project Scheduler: While
contracting with Tessenderlo-Kerly in New Mexico, The project contracted is a
grass-root project that involves scheduling of Design-Procure-Built to
Startup a mining plant at New Mexico. My responsibilities are as follows: · Involved
in providing resource loaded schedule that provides EPCM for mining plant. · EPCM schedules
development from P&ID design drawings to a production time line schedule
in P6 · Monitor
progress schedule of Engineering-Equipment deliverables to Construction
Phases and, · evaluated
time Impact that provides time extension to the project via total float
analysis/ documentation · Check
field progress Lockheed
Martin, September 10 to June 2011 (Contractor) - Aircraft Production
Scheduler : Production
schedules for Aircraft Manufacture (P3 Orion) responsible for scheduling
delivery to the US Navy while at South Carolina. My responsibilities are as
follows: · Monitoring
of production schedules from induction to Station 9 schedules. Maintenance of
the schedules through SAP in making sure that the work cards are consistently
reflect data in both soft-wares and reports delay notification (DN) to the
Program Manager. · Monitor
and evaluate critical path of the aircraft using MSP 2007 · Review
SAP man hour expenditures versus budget & report variances, Capture
all changes in the SAP CW
Chester/Newtron Electrical (Contractor) - February 10 – September 10 -
Project Scheduler: Construct Instrumentation & Electrical installation work while at
Valero Refinery. Contract includes testing and insulation of pressurized
vessels, temperature controlled equipment. My responsibilities are as
follows: · Monitor’s
schedule progress and compares current progress of work to baseline work
schedules. It also includes analyzing total float and reports impact to
project milestone. · Verifies
variances to baseline scheduling completion. Check validate field reports · Perform
quantified scheduling by system using Primavera. · Weekly
analysis of critical path overall that impacts Area Milestones. Worley Parsons, September 2007 -
November 2009 - Chief Project Control Specialist: While at Shell Refinery at Martinez, California, My responsibilities
are as follows: · Scheduling
& monitoring of critical path for pre-turnaround projects and identifying
work priorities that impacts the projected completion dates. Worked on
turnaround project planning at DCU. · Update
schedule and man-hour budget weekly to reflect current status through
resource reports in Primavera to Shell. Monitor & update resource man
loading report of the Project Engineers. Review planning and scheduling
analysis with the P.E. both in Primavera · Labor and
material data accumulated through SAP were tested in version P3 of Primavera.
· Provided
the baseline schedule and constructability schedules and adapted the final
plans for the EPCM for the Flue Gas Scrubber Project at Valero Refinery.
Level 5 schedules are proposed and submitted to Valero as final option of
executing the project. Foster Wheeler Corporation September
06 to March 07 (Contractor); Project Scheduling Engineer: While at Chevron's El Segundo assigned at Heavy Crude Project (Coker
Unit, Crude Unit, OSBL revamp). The scope of work of the project includes
cable pulling and installation of cable trays from the Coker Unit to the
newly constructed Main Control Center. This work includes termination of
cables and wire to existing substation. My responsibilities are as follows: · Weekly
schedule review/ reports (combined cost) from Contractors to ensure weekly
progress data are accurate. This requires coordination and compilation of
schedule dates and man hour/cost expenditures from contractors. · Scheduling
other work outside the Pre-turnaround work. · Coordination
and scheduling of drawings to be issued for construction necessary for
permitting in all phases of engineering work. · Monitored
and coordinated with the engineering leads to ensure that dates are
consistent with the field construction reports. Earn value methodology was
used to show progress on all projects to determine physical percent complete.
Chevron Texaco, June 2005 to July 2006
- Master Scheduler at Bollinger/Concord California (Contractor): Develop work schedules (WBS) of Hydrogen Station Plants constructed
in the US (5 projects). My responsibilities are as follows: · Prepared
work schedules of subcontractors in Fabricating CSD (Compressors Storage
& Dispensers) & PHG (Purified Hydrogen Generator) units; · Monitors
sub-contractors schedules and ensure deliveries of major equipment and its
components are timely. · Meetings
were conducted through Net Meeting to coordinate schedules to support
requirement. Monitoring project's monthly resources and progress through MS
Project Professional. · Monitoring
of monthly cost commitments of ongoing projects through SAP is performed.
Review SAP - man hour expenditures against budget report variances. Impregilo Healy JV, September 2002 to
May 2005 - Senior Scheduler: CSO Project- Heavy
Civil Work that involves Tunnels at infrastructure work located in Portland
Oregon. My responsibilities are as follows: · Cost
loading/ Estimating of work activities in the CPM baseline schedule. · Preparation
of monthly scheduling updates; charts presentations, linear scheduling
methods. · Prepares
and coordinates weekly schedules with the superintendents and Subcontractors.
Perform scheduling re-sequencing due to changes of project in maintaining
project completion dates. · Issue
project monthly reports books to Owner and City of Portland that depicts work
progress. Provided Hi-Lo revenue projected earnings to Owner Modern Continental Contractors,
December 2000 to September 2002 - Project Scheduling Engineer: Heavy Civil Work
that involves Tunnels at infrastructure work located in Portland Oregon. My
responsibilities are as follows: · Develop
conceptual bid schedules and analyzed bid scheduling criticalities. · Monitoring
of construction work activities of subcontractors of overall project.
Prepares time entitlement analysis and submits to the Owner (with cost) for
review and payment. · Involvement
in other administrative work: such as interacting with the subcontractor's
daily work cost scheduling activities. Prepares Schedule of values and cost
estimates for Owner's approval (this application is submitted to the City for
payment each month). Moffatt Nichols Company, June 1998 to
December 2000 -Senior Scheduling Engineer: Heavy Civil Work that involve infrastructure work located in Portland
Oregon. My responsibilities are as follows: · Reviews and
evaluated the project schedules of successful bidders at the LA Mid Corridor
Project (i.e. linear schedule). Reviewed the (initial) 90-day submittal
schedule and the final project schedule submittal of Tutor Saliba (with the
cost loading), · Reviews field
verify and recommends the monthly payment billing applications of Tutor
Saliba to ACTA management Team. Provided Hi-Lo revenue projected earnings to
Owner · Develop
CPM scheduling deliverables (bid specs) to be included in specification
Section 01310 (bid package preparation). Analyze time impact analysis of the
contractors. Defined scope of work that are involved to each of the work task
in the schedule for billing Kajima Engineering & Construction,
Inc, February 1994 to May 1998- Corporate Engineering Scheduling Manager: Heavy Civil Work that involves Tunnels at
infrastructure work. My responsibilities are as follows: · Assists
project managers & superintendents in the preparation of cost &
scheduling updates and cost in the schedule. Provided scheduling support to
other project site offices and develops conceptual bid schedules (bidding
stages) and analyzed bid scheduling criticalities. · Cost
loading of work activities in the CPM baseline schedule for approval by Owner
and prepares documentation for request of information (RFI). Provided all
functions in cost scheduling seeking approval with City's project controls.
(Supervised (7) engineers) Tutor-Saliba Corporation, April 1993
to February 1994 LA MTA / SFMTA); Scheduling Engineer: Provided scheduling support to project site offices
and develops conceptual bid schedules (bidding stages) and analyzed bid
scheduling criticalities. Cost loading of work activities in the CPM baseline
schedule for approval. Ralph M Parson Co, March 1992 to April
1993 Principal Scheduling Engineer: Assisted project engineers
in assigning estimated man hours in Mobil Oil Tank Farms construction budget.
My responsibility also includes monthly/quarterly reports of engineering
man-hour expenditures; as well as the weekly procurement & construction
status in the project. Analyze impacts of construction and engineering
changes and impacts which results in revising cost and man-hour budget of the
project. Harrison Western Corp, February 1986
to March 1992 Project Cost & Scheduling Engineer: Prepares and updates daily quantity reports. Prepares projects cash
flow report and maintains/ updates cost and schedules. Cost coding of
timesheets and purchase orders. Field verification of quantity installed.
Maintain change order logs. Prepares man hour report and setting up of
subcontractor various change order work estimates and analysis of cost
reports. Involvement in coordinating subcontractors change order projects and
coordination with local city agency regarding work conflicts. Cost & resource
loading of scheduling task in PMMS / Aldegraph (arrow diagram) performed. Leo A Daly Company, November 1984 to
February 1986 Project Manager Architect: Responsible for the selection & recommendation of Architects /
Engineers for the various Department of Labor projects at Washington DC.
Prepares A/E cost estimates. Negotiates and evaluates project cost and
schedules of several ongoing projects. Monitors project progress status.
Manages contractors hired in the projects. Education : Bachelor in Architecture,
University of the Santo Tomas (U.S. accredited University), AAIA; Registered
Architect, Philippine Islands (Certification #3999) US Citizen,
TWIC/RSO Available |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
Spanish |
Beginner |
|
|
Tagalog |
Fluent |
|
|
|